5G Base Station Project in Heilongjiang

Typical Cases > 5G Base Station Project in Heilongjiang
8688体育网
  • 8688体育网
  • 8688体育网

5G Base Station Project in Heilongjiang

  in 2023
  Powersupplytor communication base Stations
  LTO Battery
关键参数.png  2MWh
项目描述.png  The LTO battery can be charged and discharged at a wide temperature of minus 40 ℃, which can stabilize the power supply and ensure the stable operation of communication base stations when off-grid in the extremely cold climate of Mohe.